SCOPE OF WORK:
Development of land and protection of side slope at Uttara.

DESCRIPTION OF WORK:
Developing the land in the RS site at Digun, Bounia and Borokakar Mouza, Uttara, adjacent to the south of RAJUK Uttara 3rd Phase by filling with carried earth (sand) up to the design level and protection of the side slope by Geo-bags during 2014 - 2015.

The Challenges

Uncertainty due to Blockade.

Project Description

Client:Bangladesh Bridge Authority (BBA)
Location:Digun, Bounia and Borokakar mouza, Uttara